Peard Excavation
COMPLIANCE · TAURANGA · BAY OF PLENTY

SEDIMENT CONTROL TAURANGA.STAY COMPLIANT.

Silt fences, sediment ponds, stabilised entranceways and erosion control that passes inspection. Free site visit, fixed price in 24 hours.

  • Owner-Operated Since 2016
  • Council Compliant
  • Certified Drainlayer In House
  • Tauranga & Western BOP
Get a Free Quote

Tell us about your site.

Toby comes out, looks at the job, and you get a fixed price within 24 hours.

Or call Toby direct
027 309 6463

Toby personally reviews every enquiry.

Free site visit. No obligation. We reply within 24 hours.

WHY PEARD.

Built to pass inspection first time.

Council does not accept a silt fence that is nearly right. We install to the plan.

Installed before the ground opens.

Sediment control goes in first, not after the first rain and the first phone call.

Maintained through the job.

Controls that silt up stop working. We check and clear them while the job runs.

What our clients
actually say.

"

As a project manager from small to large scale civil construction, I can highly recommend Peard Excavation. Holly & Toby are great to deal with from the tendering stage of a project right through to the site works with their highly skilled team. Their out of the box thinking and working hard with us to get the job complete is exactly what anyone wants from an excavation company.

Mike Belcher
Bishop Building Ltd
Project Manager
"

I have worked with Toby Peard for over 8 years on new builds and renovations in the wider Bay of Plenty area. He is extremely experienced and knows what he is doing. Get him involved in your next build from day 1 — you won't regret it.

James Hopping
Hopping Homes Limited
Director
"

Stroud Homes Bay of Plenty has been working with Peard Excavation since our very first build. We have never had any issues and have never had to look elsewhere for our earthwork and excavation needs.

Shane McMah
Stroud Homes BOP
Director
"

Peard Excavation ensures that site and retaining works continue alongside each other. This reduced our timeframe and saved valuable dollars.

Hugh Blake
Wolfbrook Property Group
Project Manager
Recent Projects On Video
Mitre 10 Mega Papamoa
Longstead
Maranui Street
What You Get

HOW WE DO SEDIMENT CONTROL.

01

Free site visit and erosion assessment

02

Controls specified to your consent

03

Written fixed price in 24 hours

04

Installed before earthworks begin

05

Maintained and removed at completion

COMMON QUESTIONS ABOUT SEDIMENT CONTROL.

A Peard Field Guide
The
Dirt
Dictionary
Peard Excavation · Edition 01
  • 12 excavation terms in plain English (only slightly cheeky)
  • The pre-arrival checklist that saves you money on day one
  • What to sort before the digger arrives
Free Field Guide

Speak Digger in 10 Minutes

The plain-English guide to excavation jargon, plus the pre-arrival checklist. Free, instant, no spam.

We'll email you occasionally about earthworks tips. Unsubscribe anytime.

Ready when you are

KEEP YOUR SITE COMPLIANT.

Talk to us before you start earthworks — that's the right time.

Before you commit — Site Feasibility Assessment →