As a project manager from small to large scale civil construction, I can highly recommend Peard Excavation. Holly & Toby are great to deal with from the tendering stage of a project right through to the site works with their highly skilled team. Their out of the box thinking and working hard with us to get the job complete is exactly what anyone wants from an excavation company.
SEDIMENT CONTROL.STAY COMPLIANT.
Stormwater and erosion management for active construction sites. Council compliant, maintained, and auditable.
Sediment leaving your site is a council compliance issue — and a costly one. Peard installs and maintains sediment controls that keep your site compliant throughout earthworks and construction.
- ▸Site-specific design
- ▸Maintained throughout
- ▸Post-rain inspections
- ▸Inspection-ready
Tell us about your site.
Toby personally reviews every enquiry. We respond within 24 hours with honest advice and a clear price.
THE REAL COST OF INADEQUATE SEDIMENT CONTROL.
COUNCIL ENFORCEMENT
Sediment leaving the site and entering waterways triggers council enforcement action. Stop-work orders and fines are real consequences.
ENVIRONMENTAL LIABILITY
Discharging sediment into natural waterways creates environmental liability that goes beyond the construction phase.
INSPECTION FAILURES
Inadequate erosion controls are the most common cause of site inspection failures — delaying the next phase of your project.
HOW WE DO SEDIMENT CONTROL.
SITE-SPECIFIC SEDIMENT CONTROL PLAN
We design controls based on your site's topography, soil type, drainage patterns, and council requirements — not a generic one-size-fits-all approach.
INSTALLED BEFORE EARTHWORKS BEGIN
Sediment controls go in before the first machine cuts the ground. This is the correct sequence. Controls installed after earthworks have already started are playing catch-up.
MAINTAINED THROUGHOUT THE PROJECT
Controls are inspected and maintained throughout the earthworks phase. After every significant rain event, we check and rectify as required.
COUNCIL INSPECTION READY
Our sediment control installations are documented and auditable. When the council inspector arrives, your site is compliant.
WHAT'S INCLUDED.
EQUIPMENT FOR SEDIMENT CONTROL.
What our clients
actually say.
I have worked with Toby Peard for over 8 years on new builds and renovations in the wider Bay of Plenty area. He is extremely experienced and knows what he is doing. Get him involved in your next build from day 1 — you won't regret it.
Stroud Homes Bay of Plenty has been working with Peard Excavation since our very first build. We have never had any issues and have never had to look elsewhere for our earthwork and excavation needs.
Peard Excavation ensures that site and retaining works continue alongside each other. This reduced our timeframe and saved valuable dollars.
Dirt
Dictionary
- ✓12 excavation terms in plain English (only slightly cheeky)
- ✓The pre-arrival checklist that saves you money on day one
- ✓What to sort before the digger arrives
COMMON QUESTIONS ABOUT SEDIMENT CONTROL.
KEEP YOUR SITE COMPLIANT.
Talk to us before you start earthworks — that's the right time.
Before you commit — Site Feasibility Assessment →